Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
communication room
Next

communication room

FOB Price

Get Latest Price

|

- Minimum Order

Country:

China

Model No:

cc002

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

Product Group :

-

Contact Now
Free Member

Contact Person Ms. summer

liyuan, Shenzhen

Contact Now

Product Specification

Product Description

Heat reserve and insulate, the shelter is mainly combined by the *0mm color steel sandwich panel, the core material could adopt EPS,XPS and PU according to the requirements of the customer.
The floor adopts *8mm plywood, could satisfy the requirement of load capacity, the outer surface is coated the glass steel, could prevent the termite or the corrosion by other things.
The shelter is combined with steel column,steel beam and panels, the fittings are connected by the bolts, the panes are set outside the steel frame. Because the steel frame doesn't expose outside directly, it will prevent the cold bridge, enhance the heat reserve performance.
waterproof seal: the wall panel adopts the hidden fastener type sandwich panel, because the panels are set transversely , they can proof water very well. When the wall panels are installed completely, no needs to use any glue that also could waterproof well; the roof adopts the corrugated sheet, the four sides are extruded, in order to make the water drain out the roof quickly, and ensure there will no leaking. There is no gap between the fittings, the connect joints is the channel for the water run through, ensure there will be no leaking.
The whole shelter is combined by foundation,bearing,chassis,steel frame and the protective panel, the foundation is concrete, could predict and module , no need to pave concrete on the big area. If the floor is concrete floor , just use the bearing is ok, doesn't need concrete foundation. The steel chassis is welded by the module, and connect by the bolts. The bearing and the surface of the chassis are dipped into the hot zinc. The surface of the steel frame sprays by the antistatic coating. The color is the same as the wall panel.
 

Country: China
Model No: cc002
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: -
Packaging Detail: -
Delivery Time: -
Supplying Ability: -
Payment Type: -
Product Group : -

Related Products shenzhen huakaifeng light steel fabrication., ltd

Send a direct inquiry to this supplier

To:

Ms. summer < shenzhen huakaifeng light steel fabrication., ltd >

I want to know: